top of page

Algeria, Mostaganem Combined Cycle Power Plant 1450 Mw, Marine Works - Engineering & Consultancy

  • Placing concrete weight collars on Ø2500 HDPE pipes

  • Manufacturing of 5 reinforced concrete precast water intake heads and placing them on the seabed

  • Submerging 5 HDPE water intake pipes, each 2000 m long and Ø2500 in diameter, into the seabed and installing manholes on the pipes.

  • Flange connections of pipes to each other and to water intake heads underwater

  • Construction of discharge breakwaters

Employer: Compagnie de l'Engineering de l'Electricité et du Gaz (CEEG.Spa), Samsung C&T Corporation, TML İnşaat A.Ş.

cezayir-1.jpg
cezayir-2.jpg
cezayir-3.jpg

© 2024 TEMPUS İNŞAAT. All rights reserved.

bottom of page