Algeria, Mostaganem Combined Cycle Power Plant 1450 Mw, Marine Works - Engineering & Consultancy
-
Placing concrete weight collars on Ø2500 HDPE pipes
-
Manufacturing of 5 reinforced concrete precast water intake heads and placing them on the seabed
-
Submerging 5 HDPE water intake pipes, each 2000 m long and Ø2500 in diameter, into the seabed and installing manholes on the pipes.
-
Flange connections of pipes to each other and to water intake heads underwater
-
Construction of discharge breakwaters
Employer: Compagnie de l'Engineering de l'Electricité et du Gaz (CEEG.Spa), Samsung C&T Corporation, TML İnşaat A.Ş.